Friday, 22 March 2019

Unexpected Brochure Photo


A couple of mornings ago, Hughie the MD walked up to my desk holding up a copy of the new S 65 SXF brochure. When he reached my desk he opened it up to the back page and showed me the photo I took of the machine at Wembley filling up the inner back cover! It was a decent surprise and gave a me a laugh. It was nice to see another of my shots being used in a brochure!

This was the German version, for readers interested in a new S 65 SXF concrete pump, we should have brochures in English very soon!


Monday, 16 April 2018

A Day in the Life (of an S20)

A few months back I was invited by James Harding at Hardcrete to take some video footage of a day's pour in Chorleywood. They had recently bought a new Schwing S20 mobile pump and were happy to allow me to film for the day while they poured the 150 cubic metre concrete foundation for a new home.


We particularly wanted to show the main feature of the new S20 in that it could set up without extending outriggers beyond the edge of the vehicle itself, demonstrating that the machine could set up in very tight locations - a good thing for working in cities and towns in particular.

While I was there everyone working on the project was happy to say how pleased they were with the new Schwing machine - which is always great to hear.

We even set up a time-lapse camera and got the drone out for a bit of aerial footage! Several weeks later I had managed to edit it down to under 7 minutes. The result is above...


Wednesday, 10 January 2018

Cover Shot

A few months back our colleagues in Germany were putting together a new brochure for the latest SP 2800 static pump and asked me if I could provide a photo. This meant tracking down a 2800 machine we had recently sold that was working on a site not too far away and that I could get on site to get some photos. Thankfully such an opportunity existed over near Canary Wharf.

Unlike mobile boom pumps which can make for wonderful shots because of the boom arched majestically against a skyline, static pumps don't naturally lend themselves to looking good in pictures. They are typically hidden away in a dismal corner out of the way which makes it even more difficult to get a flattering photograph. However as luck would have it, this one had a backdrop which included a raised railway line (the DLR), some buildings and if I waited for the right moment, the sun between the buildings which would reflect in the water on the ground near the pump.

The Germans were very happy with the result and as you can see, used one of my shots on the front cover of the new brochure, which arrived here at the office a few weeks later!

Her's my original shot:



Friday, 22 September 2017

New Reptor in Ireland


There may not be any snakes in Ireland but there is certainly now one Reptor! Scott, our chief engineer was down in Oranmore (near Galway) yesterday commissioning a new S 38 SX Reptor for its new owners.

They began the pour at 7am and had finished pouring the 200m3 by 1pm with every load going straight through - as you'd expect from a new Schwing.

Now is it off to celebrate with a Guinness or a Jameson's?


Wednesday, 10 May 2017

Reptor Video

It seems, looking at the viewing statistic that you blog readers rather like the videos I put up from time to time and also stuff to do with the new S 38 SX 'Reptor' mobile pump.

Well then as a special Schwing Stetter May bonus - here for your viewing pleasure is a combination of both!


This short video showing the new mobile pump at work was sent to me this afternoon by our good colleagues in Germany and as soon as I saw it I thought I need this to be public so our customers and friends can see this amazing new machine at work.

Enjoy!


Thursday, 5 January 2017

Need A Lift?


On a recent visit to the Merseylink bridge building site I was
interested to see a Schwing S 24 X on top of an isolated platform. Another  S 24 X was at ground level, pumping concrete up to the raised one and the end of the lower one was connected directly to the pipeline on the boom of the upper one so the concrete was being pumped from ground level through both booms to the end of the upper one. The lower machine was doing the pumping while the other was placing the concrete!

I need to thank Mark Reilly from Reilly Concrete Pumping for this wonderful shot above showing the Schwing pump being lifted onto the platform - and also for the picture on the right here showing the crane about to lift it up - click on the shot to enlarge it.

Apparently a number of methods were tried in order to get the pump up onto the pylon including a large net before this 'mobile platform' was tried.

Mark very kindly showed me round the whole area where Reillys, who are supplying the concrete Pumps for the project had no less than 7 Schwing Pumps on Site! Three of them can be seen in the shot at the bottom including their new S 52 SX.



Tuesday, 9 August 2016

Safe Slewing

A few days ago I gave Scott, our chief engineer a lift down to the docks to pick up a new mobile pump - just rolled off the ferry from Germany. However beforehand there was a client nearby who needed a quick problem solved.

They were about to start using an SPB32 separate placing boom to place the concrete on a new development which was quite close to some high voltage power lines. Of course any metal (or earthed object) getting too close to these things is inviting serious trouble so they wanted us to restrict the slewing angle so the boom couldn't get too close to the lines.

We climbed up the tower and Scott set to work and programmed the necessary restrictions and had tested the results in what was probably less than half an hour while I took a few shots from the platform.

It was interesting to see an example of the variety of things our engineers are asked to do. It was also interesting (and quite affirming) to see how quickly and easily a Schwing Separate Placing Boom can be adjusted in this way.


Thursday, 7 April 2016

Linked Images

A short while ago I wrote a post about the first new generation Schwing S 52 SX Mobile pump in the UK. The machine promptly went up to its new owners - Reilly Concrete Pumping in St Helens and after a quick showing at the UK Concrete Show, was out working almost straight away.

One of its first jobs was working on the new Mersey Gateway Bridge project which offered an excellent opportunity to go and take some photos of the new machine at work. The S 52 SX was one of three Schwing pumps on site. The other two were both Schwing S 43 SX machines and between the three of them provided some wonderful photographic scenes (as well as getting the bridge built).

Below is a selection of the photos I took on site (click on an image to enlarge it):












Thursday, 3 March 2016

Surrounded By Work

How many times have you learned about something new that you'd never noticed before and all of a sudden you see examples of it everywhere you look?

Early last year I considered the fact that when learning how something is done, we often find we didn't even realise there was a problem needing this solution prior to finding out about it. I had not really previously considered how concrete reached the top of high rise buildings before finding out that we can pump it with specialised Schwing machines.

I suppose partially related to this is that once you are aware of a 'new' technology, suddenly you start seeing it all over the place.

It is probably just a random cluster but I have recently noticed a lot of concrete pumping equipment about the place as a drive about London on various errands. I will often find myself trying to identify the model of concrete pump or placing boom and see which company is responsible for it. Over the last week or so I have whizzed past a Camfauds mobile pump (I think is was an S 28 X) working on a site very close to my home, a Byrne Brothers Separate Placing boom near the city (pictured left and identified by our chief engineer as an old 3 section, 27 metre Schwing boom - still going strong), a mobile pump in Putney, one or two Concrete Mixer trucks bearing the Schwing Stetter name and a couple of our mobile pumps being driven to or from site as I have travelled around. I do try to get a picture if my camera is to hand and I'm walking or it's safe and convenient to stop. I took the picture above of a Schwing SPB 30 Separate Placing Boom a short while back when visiting the Isle Of Dogs. I hope this isn't all a sign of impending madness...


Friday, 26 February 2016

Recycled Investment

I was very pleased a couple of days back to go and visit a site in East London where the company MixIt have just installed a new Stetter Concrete Recycler.

The new site is on the Thames just East of London City airport and they produce a lot of fresh concrete at their new facility there.

Jim Taylor who owns the business saw the value many years ago in recycling the leftover unused concrete because it gives him free aggregates and water to use in fresh batches that he would otherwise have to pay for.

It also saves him from having to pay to send all that unused concrete to landfill, which, leading to less landfill is also positive thing for the local community and environment as a whole.

It was interesting seeing it all working together, and in conjunction with a silt press machine for further cleaning of the recycled water.

Normally extra cement would need to be added to fresh batches where recycled water collected in this way was being used but not here. Jim added a silt press machine to clean the water to the point that it can be used just as fresh water in new batches.

The reclaimed aggregates add up to several tons per day and while not a lot in the grand scheme of things, that is money still saved. In fact Jim, who has another similar set up at a different location said that the whole system at the other location, including the silt press paid for itself in six months.

Having the recycling system also allowed the company to gain it's ISO 14001 certificate which is quite good for landing certain jobs where the end client is concerned about environmental impacts.

All in all it seems that MixIt's investment in a Stetter Recycling system is paying serious dividends.


Tuesday, 15 September 2015

Fulfilling A Tall Order

Over in Saudi Arabia, what will be the tallest building in the world is currently under construction. Kingdom Tower in Jeddah will be over 1km high which is taller than four Canary Wharf towers standing on top of each other. It will house over half a million square metres of floor space across 240 floors. At 120m down, the foundations go deep enough to bury the London Eye or just leave the rooves of the three Barbican residential towers visible.

If you have already guessed that Schwing Stetter will be playing a major role in this development you would be absolutely correct. Indeed Schwing Stetter construction equipment and expertise is being used across the board.

To avoid long drives and unpredictable delays in the concrete supply, the concrete is being provided by two on-site Stetter HN 3.0 Batching Plants. This is being pumped through 3,750 meters of pipeline by four Schwing SP 8800 D stationary pumps and placed by five Schwing Separate Placing Booms (3 SPB 35 and 2 SPB 30s). There are also four Schwing S42SX, truck-mounted concrete pumps.

Pumping concrete to these heights means that equipment will be working at pressures significantly above 200 bar. Every part of the pumping equipment, delivery line and fastening equipment will need to be reliable and durable so as to handle this pressure with high output volumes for the long period of time it will take to complete this project. This is when it's good to know about Schwing Stetter's reputation for reliability.

Given that a Schwing pump holds the record for the highest ever vertical pumping distance, it is perhaps not surprising that Schwing Stetter was asked to provide equipment and expertise for this work. For more details please see the full news story on our website.




Friday, 26 June 2015

Hope For A Schwing From Above


Andrew at Camfauds Concrete Pumps recently alerted me to a story in The Construction Index about the building of a wind farm in Scotland, featuring a really good aerial shot (thanks to 360 Aerial Imagery Ltd) of the works. What was interesting to us was the two Schwing concrete pumps also in shot doing the work.

Scott, our chief engineer here was able to look at the picture and straight away identify them as a Schwing S34X and a Schwing S39SX. He even knew who they belonged to.

The actual story was about Hope Construction Materials having supplied the concrete for the foundations for 19 new wind turbines at Aikengall II Community Wind Farm, East of Edinburgh. The turbines, set to be commissioned in August 2016 will stand 145 metres tall and apparently be amongst the tallest in the UK and will collectivly generate 68.4 Megawatts of locally sourced energy, supplying more than 42,000 homes.

Hope provided almost 12,000 cubic metres of ready-mixed concrete from their Dunbar and Dalkieth ready mix plants for the project being built by renewable energy specialists Community Windpower Ltd.

It would seem Schwing Stetter was helping out too, pumping and placing the concrete.


Tuesday, 28 April 2015

Still Hold The Record


I was recently looking into records for concrete pumping and was pleasantly surprised to find that we still hold the word record for vertical distance pumping of 715m which was achieved using a Schwing SP4000S stationary concrete pump by the team working on the Parbati Hydroelectric Project in northern India back in 2009.

The project was to create two pressure shafts each 1550 m long x 3.5 m diameter inclined at 30° to create a vertical drop of 750 metres. The main contractors, Gammon India Limited, chose Schwing-Stetter to provide all the concreting equipment for the job including batching plants, transit mixers and concrete pumps.

The two tunnels had to first be excavated with a TBM from the bottom up and then a steel liner was installed by lowering each 6 meter section from the top and welding it in place as they went. The surrounding annulus then needed to be back-filling with concrete (around 7,000m³ for each shaft) and this was pumped from the foot of the shaft upwards over a total 1.5km length (and vertical rise of 750m) and into place. We are talking nearly ¾ of a kilometre upwards here!

A total distance pumped of 1½km in a single line push would be impressive in it's own right without even having any vertical component. Setting the vertical record at 715 metres at the same time is astonishing.

The concrete pressure reached was over 220 bar as they pumped to the top section and the concrete at the top continued to flow at 12m³/hr.

What is even more astonishing is that the SP4000 which did the work is a medium range pump and not even Schwing's most powerful model, which is the SP 8800. In addition to that, the only ware parts that needed changing  during the 7,000m³ concrete pour (plus around 2,000m³ of water) were two kidney seals.

To get some idea of the high specification of the machinery we are dealing with here, when cleaning out the pipe with water any gap between the main wearing parts in the pump would have made it impossible to generate the water pressure required. It would have come squirting out of the smallest of gaps. However even after setting such a record pumping concrete, the SP4000 was able to pump water at this pressure - proof of the self-sealing and low wear features of the Schwing ROCK valve.

The Schwing SP4000 not only set the world record for concrete pumping, it took the world record in its stride and kept going! What an amazing piece of engineering!


Tuesday, 21 April 2015

Schwing Visible From Space


It seems our equipment has been captured by the Google satellites working away in Chiswick last year. If you visit W4 5XU on Googlemaps you will see building No 7 of the Chiswick Park development in the process of being built. Circled above are the low emission Schwing SP2800 static pump and the SPB30 placing boom used to build the new 12 floor, 31,000 m2 building designed by Rogers Stirk Harbour & Partners.

Thanks to Andrew from Camfauds who kindly alerted us to this. They were supplying the Schwing concrete pumping equipment to Careys who had the contract for the building.

The structural work was finished earlier this year and building No 7 is currently being fitted out and should be ready for new tenants towards the end of the year.


Friday, 27 March 2015

Crossrail Video

Back in October last year I was invited to go and visit one of the Crossrail sites where a Schwing pump was being used by Kelly Formwork to pour the concrete 'base' slab inside the rail tunnels. While there I took the opportunity to shoot some video of what was going on. I went back again last week to get some final shots and a couple of extra interviews. Here is the finished edited result...



On the day I was there Kelly Formwork used our SP3500 to pump concrete through over 1.3km of horizontal pipeline, finishing the pour in one of the tunnels and setting a new UK record for concrete distance pumping in the process.

Everyone involved was very pleased with the equipment and service Schwing Stetter had provided - and were happy to say so. It's always good to get positive feedback like this.

It was also really great to have a chance to experience the Crossrail project for myself, walk through some tunnels including under the Thames and see the tunnel development process.


Monday, 16 March 2015

Heading Up North


On Friday I headed up North to visit a couple of our machines on site. It was a reasonably early 4:30am set off time which meant I reached Leeds a little after 9 o'clock. They were using a Schwing S39SX to pour slabs in a new medium rise construction near the city centre (see below).

Then it was off to Preston where Lancashire Country Council were using a Schwing S43SX to place concrete under a new section of road which they were widening (see above).

There was a light layer of snow blanketing the countryside alongside the M62 on the way to Preston which helped make the area very picturesque. It looked like a lovely part of the country - even if just from the windows a passing vehicle on the motorway.

Everyone I spoke to was very happy with their Schwing equipment which is always good to hear when you have travelled that far.

Come mid afternoon it was time to head back down to London. I arrived back just after 7pm after a long but pleasant and fruitful day.


Wednesday, 18 February 2015

Great View

View of the Milenium Dome and surrounding area from high across the river
One of the things I really enjoy about this job is visiting some of the sites where our equipment is being used and in many cases noting how it is being used and how happy our customers are with it.

During one of these memorable occasions I visited a high rise development in Canary Wharf where they were using one of our SP2800 static pumps.

A Schwing Stetter ad featuring view from the top of a high rise developmentThe offer to go right up to the top was too good to pass up. The view was spectacular (as you can see here.)

View of construction site from top of high rise being builtWhile there, I also managed to take this photo looking straight down with the actual pump visible in the picture and a truck pouring concrete into it.

It turned out to be such a great shot that I flipped it around a bit and used it in this ad which has featured in a couple of trade magazines. (You can enlarge these images by clicking on them.)

And yes, the customer was very happy with the machine!