Wednesday, 9 August 2017

Training For Cats


Today was the second of two days of training in our offices conducted by a gentleman from Caterpillar engines. As readers may be aware, our static pumps all now come with Cat engines and so it is important for our engineers to fully understand the technical aspects of these.

This training was to bring us up to speed with the latest (full and final) specifications for diesel emissions using Diesel Emission Fluid (AdBlue being a popular example). This means our engineers are now qualified to maintain the latest generation of Caterpillar diesel engines.

As well as our own engineers, we invited engineers from a couple of our clients, Coinfords and Careys to come along to the training too - because the more our customers get out of their Schwing Stetter equipment, the better it is for everyone.


Tuesday, 6 June 2017

Filling the Space


It's not often that we have rows of empty shelves and storage space in our parts warehouse but we've got some now due to a major reorganisation of our parts storage. Towards the beginning of the year we expanded the warehouse area by extending the mezzanine floor over the reception area and now with everything moved about we have put more shelving into the newly created space.

The reason for all this? It's all because of the wonderful new Schwing 'Reptor' S 38 SX mobile concrete pump that we are now selling!


When we add a new machine to the Schwing concrete pumping arsenal, we need to make sure that we keep our promise to have the full list of necessary spare parts available, as we do across our entire range of products. That's why Schwing Stetter can usually get you up and running again within hours of a breakdown.

So the new shelves will soon be stocked with S 38 SX parts, and you'll soon be able to order them - assuming you're lucky enough to have a new S 38 SX pump!


Monday, 23 February 2015

Expert Advice

S61 SX mobile pump with the boom half openHaving arrived early to ensure I was ready for a meeting first-thing about our quotations procedures, I was asked by Scott (our chief engineer) at about 8am if I could go and pick up a chap from the airport. Apparently his flight had been delayed by around two hours and, due to other commitments Andy wasn't able to pick him up at the later time.

Being in Perivale, Heathrow airport isn't actually very far away from us. If there was no traffic it would be a 30 minute round trip. However at around 8:30am? Middle of the morning rush? 30 minutes is almost taken up trying to reach the end of the road!

However, get there I did in the end (with the meeting postponed by a few hours). The chap turned out to be Andre, an engineer who had popped over from Germany (our main office and factory) for two days to help us sort out an issue with a client's machine.

Giving him a lift to his hotel on my way home at the end of the day, I found out it was one of our S61 SX mobile pumps (which is so big that the 5 axle chassis is dwarfed by the only half extended boom in this picture). He had come to sort out a difficult issue to do with the remote control system - which he had done. So now he was about to enjoy a well earned proper British cider or 2 (which he said is difficult to find in Germany) and a rest before visiting the client the next day.