Cover Shot

A few months back our colleagues in Germany were putting together a new brochure for the latest SP 2800 static pump and asked me if I could provide a photo. This meant tracking down a 2800 machine we had recently sold that was working on a site not too far away and that I could get on site to get some photos. Thankfully such an opportunity existed over near Canary Wharf.

Unlike mobile boom pumps which can make for wonderful shots because of the boom arched majestically against a skyline, static pumps don't naturally lend themselves to looking good in pictures. They are typically hidden away in a dismal corner out of the way which makes it even more difficult to get a flattering photograph. However as luck would have it, this one had a backdrop which included a raised railway line (the DLR), some buildings and if I waited for the right moment, the sun between the buildings which would reflect in the water on the ground near the pump.

The Germans were very happy with the result and as you can see, used one of my shots on the front cover of the new brochure, which arrived here at the office a few weeks later!

Her's my original shot:



Monday, 14 September 2015

Everyone Happy

Leading concrete frame specialists MPB Structures have just taken delivery of four new Schwing Concrete Pumps. MPB have been in the industry since 1987 but have only recently been a Schwing Stetter client, having previously sourced their concrete pumps elsewhere.

Having purchased a Schwing S36X late in 2014 and received it in early January 2015, they were so happy with the equipment and level of service from Schwing Stetter (UK) Ltd, that they placed further orders for a Schwing SP1800D tier 4i, 2 more S36X’s and an SP2800D. All have now been delivered.

Everyone here works very hard to ensure our customers get the best possible service and equipment and it is very fulfilling when this is recognised by our customers through further orders.We are extremely happy to be working with MPB who have invested in a broad range of Schwing Stetter technology and we hope this is the beginning of a long lasting partnership.


Tuesday, 21 April 2015

Schwing Visible From Space


It seems our equipment has been captured by the Google satellites working away in Chiswick last year. If you visit W4 5XU on Googlemaps you will see building No 7 of the Chiswick Park development in the process of being built. Circled above are the low emission Schwing SP2800 static pump and the SPB30 placing boom used to build the new 12 floor, 31,000 m2 building designed by Rogers Stirk Harbour & Partners.

Thanks to Andrew from Camfauds who kindly alerted us to this. They were supplying the Schwing concrete pumping equipment to Careys who had the contract for the building.

The structural work was finished earlier this year and building No 7 is currently being fitted out and should be ready for new tenants towards the end of the year.


Wednesday, 18 February 2015

Great View

View of the Milenium Dome and surrounding area from high across the river
One of the things I really enjoy about this job is visiting some of the sites where our equipment is being used and in many cases noting how it is being used and how happy our customers are with it.

During one of these memorable occasions I visited a high rise development in Canary Wharf where they were using one of our SP2800 static pumps.

A Schwing Stetter ad featuring view from the top of a high rise developmentThe offer to go right up to the top was too good to pass up. The view was spectacular (as you can see here.)

View of construction site from top of high rise being builtWhile there, I also managed to take this photo looking straight down with the actual pump visible in the picture and a truck pouring concrete into it.

It turned out to be such a great shot that I flipped it around a bit and used it in this ad which has featured in a couple of trade magazines. (You can enlarge these images by clicking on them.)

And yes, the customer was very happy with the machine!