Wednesday, 30 November 2016
Surprise Date
Our 2017 calendars have arrived from Germany and guess who's got the January spot? The opening picture is the one I took up at Merseylink of the three Reilly's pumps at dawn!
I knew they were putting my picture in there somewhere but it's nice to open the calendar and actually see it 'in the flesh' as it were. Nice also to realise that my 'work' will be hanging on thousands of walls around the world, if only for a month!
They have cropped the original a little differently to how I did (see mine below) - basically because theirs needs to fit into a square rather than a rectangle - I've think they've done it just fine though.
Happy January everyone (when it comes...)
Thursday, 29 September 2016
New Platform
As we constantly strive for better ways to do things and increase our productivity, it was decided to make use of a whole lot of unused space a few metres above the floor in the back corner a create another mezzanine floor.
Robs design and workmanship once again came to the fore to build everything needed and over the last few weeks the whole thing was build and assembled from scratch. He was even able to tell me how weight each step was able to hold. Such a talented team we have...
Robs design and workmanship once again came to the fore to build everything needed and over the last few weeks the whole thing was build and assembled from scratch. He was even able to tell me how weight each step was able to hold. Such a talented team we have...
![]() |
| The space to fill |
![]() |
| Rob assembling the staircase |
![]() |
| First part of steel structure in place |
![]() |
| Structure taking shape |
![]() |
| Flooring down |
![]() |
| The view from the new platform |
![]() |
| All finished |
Wednesday, 10 August 2016
Old Pictures
When a firm has been going as long as this, you never know what you might find lurking around the place. Yesterday, while sorting something in one corner of the workshop I suddenly noticed three pictures propped up by a pipe again the wall.
My first thought was that they were paintings; the years of grime mixed with the slightly surreal colours of old images combined to remind me for a moment of some of my dad's old paintings in his workshop. A couple of seconds and a slightly closer inspection revealed them instead however to be photos of some of our pumps.What I found really intriguing was the last one (at the bottom here). It was obviously a very old style pump. Scott (our chief engineer) vaguely recognised it as one of our old Screed pumps from the 1980s - possibly from before Schwing and Stetter had joined forces or Schwing had patented the Rock Valve (both happened in 1982).
Scott also mentioned that one of our long serving old employees, Jack, features in the one in front of Tower Bridge (click of the image to enlarge it).A few minutes with a damp cloth and some paper towel managed to remove most of the dirt from the pictures and so I was able to get the shots of them here on the right before placing them back where I had found them, albeit a little cleaner and brighter.
Tuesday, 9 August 2016
Safe Slewing
A few days ago I gave Scott, our chief engineer a lift down to the docks to pick up a new mobile pump - just rolled off the ferry from Germany. However beforehand there was a client nearby who needed a quick problem solved.They were about to start using an SPB32 separate placing boom to place the concrete on a new development which was quite close to some high voltage power lines. Of course any metal (or earthed object) getting too close to these things is inviting serious trouble so they wanted us to restrict the slewing angle so the boom couldn't get too close to the lines.
We climbed up the tower and Scott set to work and programmed the necessary restrictions and had tested the results in what was probably less than half an hour while I took a few shots from the platform.
It was interesting to see an example of the variety of things our engineers are asked to do. It was also interesting (and quite affirming) to see how quickly and easily a Schwing Separate Placing Boom can be adjusted in this way.
Wednesday, 6 July 2016
Promotional Film
Over at our German HQ, our opposite numbers have put together a rather good promotional video which they have playing in their reception area. They have been kind enough to forward me the file for this - so here it is for your viewing pleasure...
Wednesday, 11 May 2016
Animated Ability
The people at our Head Office in Germany have been busy of late. Alwyne, one of our very good sales chaps came back from Bauma with a memory stick for me with some really good animations which the Germans had put together. They show the new S 38 SX 'Reptor' boom opening and reaching into some really tight spots.
One of this blogs most popular posts has been the one showing the S 36 S reaching into the workshop space. These animations show how the new Reptor (as in Reptile - Snake like flexibility...) can reach into a difficult space in a similar manner, and also shows it opening up under a restricted height (7.4 metres since you ask).
I have put them both on a new web page on out website. You can also see them below...
One of this blogs most popular posts has been the one showing the S 36 S reaching into the workshop space. These animations show how the new Reptor (as in Reptile - Snake like flexibility...) can reach into a difficult space in a similar manner, and also shows it opening up under a restricted height (7.4 metres since you ask).
I have put them both on a new web page on out website. You can also see them below...
Monday, 9 May 2016
Boom Up Stairs
Creating such a series was as interesting challenge as it's not a just a quick photo cut up and stuck on the wall.
A second visit to the S 52 SX at Merseylink was organised (thanks to Paul and Mark at Reilly's) which was luckily a short pour so the pump operator had the time afterwards to raise the boom to the right angle to get the shots. I wanted the angle to roughly match the angle of the stairs so it could reach from the lower left corner of the space to the upper right one.
There is actually a bit of overlap there on the finished canvasses - making the boom look a little longer compared to the size of the truck, but for a boom that can reach the other end of an Olympic sized swimming pool anyway, the exaggeration is quite small - the S 52 SX really is an impressive piece of equipment.
A few calculations were required to get them in their correct positions on the wall with the whole display centred properly but I think people would agree that the finished display was worth the effort.
Thursday, 28 April 2016
Linked T-Shirt
Part of my job is to design and procure promotional clothing like the branded caps t-shirts and polo shirts that we wear and (occasionally!) give out to clients... Sometime the designs are my own ideas and sometimes the ideas comes from Hughie (the MD) or even one of the staff.
For this one above (a one off exclusive run for Bauma) Hughie wanted to include a bar code and (at my suggestion) a QR code that could actually be read. And so here it is - a t-shirt that connects you to the internet!
The link is of course a page on our website specifically for people who have spotted someone wearing one of these cool puppies...
Subscribe to:
Posts (Atom)












