Thursday, 14 May 2015
Evolving Concrete Show
Last week I popped in to see the newest London concrete-centric exhibition, Evolving Concrete. This was held in the Business Design Centre in Islington so it was relatively easy to reach (being that I am based in London).
What was nice about this one was that it was being put on by the Concrete Society itself rather than an 'events organisation'. So it was conceived with the specific needs of the industry in mind.
It was a fairly small affair - the picture above more or less shows the extent of it. However I did speak to some interesting exhibitors about various aspects of concrete and particularly, as the name would suggest, how concrete and its production is evolving. One of the most interesting nuggets of knowledge I picked up was about cement-free concrete which uses ground blast furnace slag in place of Portland cement plus a special additive. My second (but main) question was, "Does it react the same way to plasticisers, retarders and other admixtures?" - or in essence, is it just as easy to create a batch to send through a concrete pump? According to the gentleman I spoke to, the answer was 'yes'.
The main thing lacking from the show was the big machines you normally see at these things. It was clearly not possible to put a large mobile concrete pump or batching plant on the floor of this particular exhibition space and the only large piece of kit was parked outside across from the entrance.
I think it is good to have a concrete specific show in London - there are certainly a lot of people in the industry working close by. Although it certainly wasn't packed when I was there, which was around the middle of the day on Wednesday. It was suggested that many people would turn up later in the afternoon when they had finished on their various building sites.
Perhaps the next one will evolve to be at a venue with more scope for larger equipment as well...
Tuesday, 28 April 2015
Still Hold The Record
I was recently looking into records for concrete pumping and was pleasantly surprised to find that we still hold the word record for vertical distance pumping of 715m which was achieved using a Schwing SP4000S stationary concrete pump by the team working on the Parbati Hydroelectric Project in northern India back in 2009.
The project was to create two pressure shafts each 1550 m long x 3.5 m diameter inclined at 30° to create a vertical drop of 750 metres. The main contractors, Gammon India Limited, chose Schwing-Stetter to provide all the concreting equipment for the job including batching plants, transit mixers and concrete pumps.The two tunnels had to first be excavated with a TBM from the bottom up and then a steel liner was installed by lowering each 6 meter section from the top and welding it in place as they went. The surrounding annulus then needed to be back-filling with concrete (around 7,000m³ for each shaft) and this was pumped from the foot of the shaft upwards over a total 1.5km length (and vertical rise of 750m) and into place. We are talking nearly ¾ of a kilometre upwards here!
A total distance pumped of 1½km in a single line push would be impressive in it's own right without even having any vertical component. Setting the vertical record at 715 metres at the same time is astonishing.
The concrete pressure reached was over 220 bar as they pumped to the top section and the concrete at the top continued to flow at 12m³/hr.
What is even more astonishing is that the SP4000 which did the work is a medium range pump and not even Schwing's most powerful model, which is the SP 8800. In addition to that, the only ware parts that needed changing during the 7,000m³ concrete pour (plus around 2,000m³ of water) were two kidney seals.
To get some idea of the high specification of the machinery we are dealing with here, when cleaning out the pipe with water any gap between the main wearing parts in the pump would have made it impossible to generate the water pressure required. It would have come squirting out of the smallest of gaps. However even after setting such a record pumping concrete, the SP4000 was able to pump water at this pressure - proof of the self-sealing and low wear features of the Schwing ROCK valve.
The Schwing SP4000 not only set the world record for concrete pumping, it took the world record in its stride and kept going! What an amazing piece of engineering!
Labels:
Achievements,
BP4000S,
Concrete Pumping,
Engineering,
On Site,
Record
Tuesday, 21 April 2015
Schwing Visible From Space
It seems our equipment has been captured by the Google satellites working away in Chiswick last year. If you visit W4 5XU on Googlemaps you will see building No 7 of the Chiswick Park development in the process of being built. Circled above are the low emission Schwing SP2800 static pump and the SPB30 placing boom used to build the new 12 floor, 31,000 m2 building designed by Rogers Stirk Harbour & Partners.
Thanks to Andrew from Camfauds who kindly alerted us to this. They were supplying the Schwing concrete pumping equipment to Careys who had the contract for the building.
The structural work was finished earlier this year and building No 7 is currently being fitted out and should be ready for new tenants towards the end of the year.
Friday, 17 April 2015
Reaching Inside
We recently wanted to show how manoeuvrable the boom on one of our S36X mobile concrete pumps is. By way of demonstration we parked it near the entrance to our workshop and poked the boom in through the door to show how easily it can reach into an enclosed space.
As can be seen above the large rotation angle of the tip section (238° since you ask) not only makes it easy to steer the boom into such a space but also increases its flexibility once in place.
As you can also (just about) see, it was positioned using a radio remote (via a Vector control system) - so you can easily position yourself where you can best see what's going on.
I know that I was impressed!
Friday, 10 April 2015
Innovation Award Shortlist
Back in February I mentioned that we had just solved a problem with a bit of innovative customisation regarding the opening of the drum flap on a mixer truck. Well it seems that the client wasn't the only one impressed by the work.We have been shortlisted for the 'London Innovation of the Year' category of the London Construction Awards 2015.
Its nice to have our work recognised and it certainly shows what a great engineering team we have here. Here is a picture of the finished open drum flap on the truck having now been painted up.
If you want to see it actully working - there are a couple of short videos on our website customisation page here...
Friday, 27 March 2015
Crossrail Video
Back in October last year I was invited to go and visit one of the Crossrail sites where a Schwing pump was being used by Kelly Formwork to pour the concrete 'base' slab inside the rail tunnels. While there I took the opportunity to shoot some video of what was going on. I went back again last week to get some final shots and a couple of extra interviews. Here is the finished edited result...
On the day I was there Kelly Formwork used our SP3500 to pump concrete through over 1.3km of horizontal pipeline, finishing the pour in one of the tunnels and setting a new UK record for concrete distance pumping in the process.
Everyone involved was very pleased with the equipment and service Schwing Stetter had provided - and were happy to say so. It's always good to get positive feedback like this.
It was also really great to have a chance to experience the Crossrail project for myself, walk through some tunnels including under the Thames and see the tunnel development process.
On the day I was there Kelly Formwork used our SP3500 to pump concrete through over 1.3km of horizontal pipeline, finishing the pour in one of the tunnels and setting a new UK record for concrete distance pumping in the process.
Everyone involved was very pleased with the equipment and service Schwing Stetter had provided - and were happy to say so. It's always good to get positive feedback like this.It was also really great to have a chance to experience the Crossrail project for myself, walk through some tunnels including under the Thames and see the tunnel development process.
Labels:
Concrete Pumping,
Crossrail,
Engineering,
On Site,
SP3500,
Video
Thursday, 26 March 2015
Picture This
Having been building up a stock of pictures of our machines out on site hard at work, it was thought time to start putting some of these on display. Here is the result so far - making one particular wall much more interesting.
Monday, 16 March 2015
Heading Up North
On Friday I headed up North to visit a couple of our machines on site. It was a reasonably early 4:30am set off time which meant I reached Leeds a little after 9 o'clock. They were using a Schwing S39SX to pour slabs in a new medium rise construction near the city centre (see below).
Then it was off to Preston where Lancashire Country Council were using a Schwing S43SX to place concrete under a new section of road which they were widening (see above).There was a light layer of snow blanketing the countryside alongside the M62 on the way to Preston which helped make the area very picturesque. It looked like a lovely part of the country - even if just from the windows a passing vehicle on the motorway.
Everyone I spoke to was very happy with their Schwing equipment which is always good to hear when you have travelled that far.
Come mid afternoon it was time to head back down to London. I arrived back just after 7pm after a long but pleasant and fruitful day.
Subscribe to:
Posts (Atom)