Thursday, 29 September 2016

New Platform

As we constantly strive for better ways to do things and increase our productivity, it was decided to make use of a whole lot of unused space a few metres above the floor in the back corner a create another mezzanine floor.

Robs design and workmanship once again came to the fore to build everything needed and over the last few weeks the whole thing was build and assembled from scratch. He was even able to tell me how weight each step was able to hold. Such a talented team we have...
The space to fill

Rob assembling the staircase

First part of steel structure in place

Structure taking shape

Flooring down

The view from the new platform

All finished

No comments:

Post a Comment